Warsaw-Gas-Work-4.9.24 Published April 23, 2024 4:51 PM at 900 × 429 in NIPSCO Work Ongoing Through Warsaw For Gas Line Realignment A backhoe drops dirt at the Millworks work site on Tuesday, April 9. Read More Featured Local Savings Featured Local Savings